Airport terminal rehabilitation and addition, New England
Airport terminal thermal break framing
HSS 3½x3½x¼ frame assemblies with L2½x2½x¼ and L4x4x¼ members, supported off W-shape framing, with 1" Armatherm 500 series structural thermal breaks bolted at the frame-to-structure connections.
- Deliverables
- Framing plans, Sections, Frame detail sheets with bill of material, Field bolt lists
- Turnaround
- Rev A for approval September 3, 2026; Rev 0 for fabrication September 9, 2026